PORTFOLIO
Real projects. Real constraints. Real solutions.
Explore ground-up builds, renovations, and tenant improvements with clear scope, challenges/solutions, and results for every project.
EXCLUSIVE PRIVATE GUEST RANCH
INTERIOR-BUILD
A decade after serving as superintendent on the original shop build—where the two wings were finished for ranch maintenance and UTV/snow machine storage—we returned in spring–summer 2024 to complete the unfinished center core (originally planned as living quarters). Working around active operations, we phased interiors, coordinated targeted MEP tie-ins, and delivered a clean build-out from late March to late August on a tight schedule.
PROJECT SNAPSHOT
Quick facts from Merritt Contracting—size, schedule, budget range, and site conditions.
-
Size: ~5,100 SF (central core of existing facility)
-
Schedule: Late March–Late August 2024 (~5 months)
-
Budget Band: High six figures–low seven figures (owner-approved)
-
Special Conditions: Active operations in both wings (maintenance equipment / UTVs & snow machines)
Merritt Contracting exceeded our expectations. Jimmy’s leadership, communication, and attention to detail kept the project on schedule and gave us confidence every step of the way.
MARK RUMBAUGH
EXCLUSIVE PRIVATE GUEST RANCH, MANAGER
SAN JUAN CANCER CENTER -
FRANCIE SMILES INFUSION CENTER
FULL INTERIOR DEMO & REMODEL
Merritt Contracting transformed an existing primary care clinic into a state-of-the-art oncology infusion center as part of the San Juan Cancer Center’s expansion. The full renovation included complete demolition, interior rebuild, and healthcare code upgrades, resulting in a modern, efficient space designed to enhance patient comfort and support specialized medical care.
PROJECT SNAPSHOT
Quick facts from Merritt Contracting—size, schedule, budget range, and site conditions.
-
Size: 7,600 SF
-
Timeline: September 2024 – March 2025
-
Special Conditions: Full interior remodel with healthcare code compliance
Working with Merritt Contracting on a 6-month medical facility remodel was a top-notch experience from start to finish.
After several planning sessions and defining the scope of our project in detail, a precise line-item bid was produced allowing us to secure the contract with highly reliable budgeting figures. Upon kick-off, an equally detailed project charter was drafted and deployed to keep all aspects from demolition to keys in hand, on track and on time.
Throughout the length of this project Merritt Contracting worked closely with the architects, various subspecialties and state surveyors creating a low stress experience for all of us involved.
ERIC KOVAL
FRANCIE SMILES MEDICAL INFUSION CENTER,
SERVICE LINE DIRECTOR, RN, BSN, MBA
PROJECT SNAPSHOT
Quick facts from Merritt Contracting—size, schedule, budget range, and site conditions.
-
Size: Multi-clinic renovation program (several facilities)
-
Schedule: Phased over 2023–2024 with continuous occupancy
-
Budget Band: Multi–million dollar range (owner-approved)
-
Special Conditions: Occupied healthcare facilities with strict regulatory, infection-control, and schedule requirements
Merritt Contracting demonstrated exceptional professionalism, expertise, and commitment to excellence. Their understanding of healthcare standards and patient-centered design ensured our clinics were both functional and efficient. The team communicated clearly, anticipated challenges, and provided solutions that kept us on track. The result is a series of clinics that are safe, beautiful, and built for patient care.
COURTNEY CRYER
MONTROSE REGIONAL HEALTH,
CHIEF OPERATING OFFICER
OXYGEN REFILL
PAD EXPANSION
MONTROSE REGIONAL HEALTH
Merritt Contracting expanded the hospital’s existing oxygen fill station pad to safely accommodate larger delivery trucks and increased demand. The work was completed adjacent to an active oxygen service area with zero operational downtime, ensuring full compliance with healthcare life-safety requirements.
PROJECT SNAPSHOT
Quick facts from Merritt Contracting—size, schedule, budget range, and site conditions.
-
Timeline: November 2024
-
Special Conditions: Work performed adjacent to active oxygen delivery area
Merritt Contracting approached our oxygen pad expansion with professionalism, precision, and a clear understanding of safety and compliance. Their team coordinated work seamlessly around critical hospital operations and delivered a finished product that met every healthcare standard without disruption to patient care.
COURTNEY CRYER
MONTROSE REGIONAL HEALTH,
CHIEF OPERATING OFFICER
CARDIOLOGY NFPA 101 CODE UPDATES
MONTROSE REGIONAL HEALTH
Merritt Contracting completed life safety code upgrades for Montrose Regional Health’s new cardiology clinic, an off-campus facility requiring specialized regulatory compliance. Work included removing mechanical systems from the crawlspace, constructing new fire-rated mechanical rooms, upgrading equipment, and installing fire-rated doors—all completed safely and on schedule while the clinic remained fully operational.
PROJECT SNAPSHOT
Quick facts from Merritt Contracting—size, schedule, budget range, and site conditions.
-
Timeline: June 2024 – August 2024
-
Special Conditions: Active healthcare facility; required Life Safety Code compliance for off-campus location
Merritt Contracting managed our cardiology clinic upgrades with exceptional attention to detail and regulatory compliance. Their communication, coordination, and proactive approach ensured that the work was completed safely, efficiently, and to the highest standard of quality.
COURTNEY CRYER
MONTROSE REGIONAL HEALTH,
CHIEF OPERATING OFFICER
GRACE COMMUNITY CHURCH
YOUTH ADDITION & REMODEL
Merritt Contracting partnered with Grace Community Church on a full design-assist remodel and addition to their Youth building—expanding the space from 3,000 to 7,500 square feet. The phased project was completed around ongoing ministry activities, seamlessly integrating new construction with existing facilities to support the church’s growing youth program.
PROJECT SNAPSHOT
Quick facts from Merritt Contracting—size, schedule, budget range, and site conditions.
-
Size: Expanded from ~3,000 SF to ~7,500 SF
-
Timeline: June 2024 – January 2026
-
Special Conditions: Phased work during ongoing church operations
Working with Merritt Contracting on our Youth Building remodel and expansion has been a fantastic experience. Their team consistently demonstrates professionalism, clear communication, and a genuine understanding of our church's mission and needs. They’ve gone above and beyond to ensure the project stays on schedule without compromising on quality or budget. The attention to detail and care for our space—especially knowing it serves our next generation—has meant so much to us. We couldn’t be more grateful for their partnership in creating a space where students can grow in faith and community.
KEN LENTZ
GRACE COMMUNITY CHURCH,
EXECUTIVE OPERATIONAL PASTOR

IN-PROGRESS PROJECTS
Take a Sneak Peek behind the
scenes of our upcoming projects
MOUNTAIN VIEW THERAPY CLINIC
NEW CONSTRUCTION
CLINIC IN RIDGWAY
Construction is underway on the new Mountain View Therapy Clinic in Ridgway, where Merritt Contracting is expanding access to high-quality therapy services on the Western Slope. The project includes modern treatment spaces, accessible design, and efficient layouts to support both patients and staff.